A swath of Miami Beach was washing away. The fix? Dump 285,000 tons of sand on it
To widen a 3,000-foot stretch of Miami Beach’s shore that was washing away, the U.S. Army Corps of Engineers dumped 285,412 tons of sand on Mid-Beach, a $11.5 million project, funded with a combination of federal, state and county dollars.
How and why China is building islands in the South China Sea
China has been building manmade bases over some of the Spratly Islands in the South China Sea since 2014, specifically targeting shallower areas, sandbanks, and reefs—islands, the shallower the better; a place that won’t sink under a load of concrete.